March 11 2008 at 1:30pm Water being pumped out of this construction site hole.
March 11, 2008 Williams Grove Bridge Construction Dillsburg Pa.
Williams Grove Road over the Yellow Breaches in Williams Grove Pennsylvania
and Is being pumped straight into the Yellow Breaches
An Filter bags on site are NOT being used Pictured below
Over all site view below showing pump
location on right and discharge on left
Other side of Creek Road along
Williams Grove road being excavated
click on any picture for a larger view
Many more pictures are available,
limited pictures are on this website
Erosion and Sediment Pollution Control PLAN page 1
General Notes:
#8 ALL pumping of sediment laden water shall be through a
sediment control BMP, such as a pumped water filter bag
discharging over non-disturbed areas.
Laws Governing Stream and Water Quality
Pennsylvania Clean Streams Law (35 P.S. §§ 691.1-691.1001);
Pennsylvania Stormwater Act (32 P.S. §§ 680.1-680.17);
Federal Clean Water Act (33 U.S.C.A. § 1342),
40 CFR Part 122

25 Pa Code Chapters 92, 93, 102, 105 and 111.

PA Code, Title 25, Chapter 102 mandates that anyone engaged in “earth disturbance
activities” must develop, implement, and maintain erosion control Best Management
Practices (BMP’s) to minimize the potential for accelerated erosion and sedimentation into
Pennsylvania waterways